3-Step Pungent Flavor Changeover
3-Step Pungent Flavor Changeover

3-Step Pungent Flavor Changeover

Product price:
Negotiable
Product brand:
Yet provide
Region:
china
Product Categories:
Processing & Packaging
Favorites
SUNTYECH PROCESS ENGINEERING(SHANGHAI) CO., LTD.
1st Floor, South Building, Building E, No. 210 Xuanqiu Road, Pudong New Area, Shanghai
less than 10 person
North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa
Manufacturer

Product Details

Certificates/Standards: N;
Monthly Output: Not provided
Regional: Not provided
Packaging Information: Not provided
Mode Of Payment: Not provided
Delivery Lead Time: Not provided
Main Sales Markets: North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa
Sample Provided: No
Sample Policy: Not provided
Minimum Quantity: Not provided
                                   

Summary

To prevent flavour and odor cross-contamination in finished beverages, intensive line-cleaning

regimes are required when changing from pungent to non-pungent flavour products. These

cleaning cycles typically required a lengthy hot 3-step or cold 4-step CIP. The duration of these

CIP processes typically average 120 minutes, Trustwater was challenged to test and validate its

innovative rapid ECA changeover protocol with the aim of reducing changeover times and to

provide the plant with a safe alternative to traditional chemicals. The objective was to enable the

plant to increase production and to move towards a ‘Just- In-Time’, lean manufacturing model.

Background

This study was carried out on a US based, 5-line Carbonated Soft Drink bottling plant which

consists of 16 syrup tanks, 2 can lines,3 PET lines and 1 Bag-In-Box line. The plant operates

24/7.This facility runs 800-900 pungent/sensitive changeovers per year.

Approach

Initially, a number of bench-top tests were performed and proved successfully in removing

pungent flavours from beakers and other selected surfaces . Following this initial success, a test

rig was designed to perform dynamic continuous flow tests, simulating typical plant CIP cleaning

conditions, These tested varying contact times, end-user products, dried-on materials and

different substrates. Trustwater subsequently connected a generator and skid platform to the CIP

system. The former 120 minute CIP protocol was replaced with a much shorter 3-step

Trustwater ECA protocol. The total duration of the new Trustwater 3-step pungent flavour

changeover was 20 minutes. In order for the company to approve use of the 3-step changeover,

it was necessary to validate as per the protocol below:

Protocol for Pungent Flavours Changeovers with Trustwater:

1. Clean and sanitize a production line in one step using Trustwater

2. To evaluate production line changeover effectiveness , test and document the following parameters:

Trustwater Concentration Test Trustwater solution at the filler during wash to ensure concentration level is achieved
Trustwater Removal Test final rinse for residual
Taste, Odor, and Appearance of Final Rinse Water Perform a taste test on the final rinse water to ensure no off-flavor, odors or colors
Taste, Odor, and Appearance of Finished Beverage Perform a taste test on the containers from the first commercial turn of the filler to assure no off-flavours, odors or colours prior to production
Taste Analysis For the first two changeovers from a pungent to a non-pungent, submit: Two finished product containers from the first commercial turn of the filler ,and two finished products samples from the end of the run to be used as a control
Odor Analysis of Rinse Water For the first two Trustwater ECA CIPs per line: Submit four samples of final rinse water from the filler for odor analysis Send four samples of the final rinse water from a non-Trustwater CIP to be used as a control

3.Repeat steps 1 and 2 a total of 20 times to collect the required Trustwater changeover data

4.Submit data for Trustwater changeover sanitization approval

Results:

Following the trail and strict validation process it was evident that Trustwater had successfully

developed and implemented the first ECA pungent flavour changeover CIP, reducing individual

CIP times by an enormous 100 minutes.

Plant Benefits:

Pungent flavour changeover reduced from 120 minutes to 20 minutes

Increased production up-time by over 130000 minutes per annum

Labor saving of $242985 per annum

Increased water savings

Significant energy savings

Send a direct inquiry to this supplier

SUNTYECH PROCESS ENGINEERING(SHANGHAI) CO., LTD.
*Enquiry details:
{{textarea_file_name}}
By clicking the Send button, unregistered users become sjgle members by default and agree to send queries.
Send Inquiry Now
3-Step Pungent Flavor Changeover
3-Step Pungent Flavor Changeover
Product price:
Negotiable
Product brand:
Yet provide
Region:
china
Product Categories:
Processing & Packaging
Inquire Now
SUNTYECH PROCESS ENGINEERING(SHANGHAI) CO., LTD.
1st Floor, South Building, Building E, No. 210 Xuanqiu Road, Pudong New Area, Shanghai
less than 10 person
North America,Central/South America,Western Europe,Eastern Europe,Australasia,Asia,Middle East,Africa
Manufacturer
Send query and log in to register
SUNTYECH PROCESS ENGINEERING(SHANGHAI) CO., LTD.
SUNTYECH PROCESS ENGINEERING(SHANGHAI) CO., LTD.
3-Step Pungent Flavor Changeover
3-Step Pungent Flavor Changeover
*Enquiry details:
{{textarea_file_name}}
By clicking the Send button, unregistered users become sjgle members by default and agree to send queries.
Send Inquiry Now
Submit Aeacquire
Please go to email to check the verification code.